A straightforward overlay can be completed more quickly than a full excavation and rebuild. Larger driveways, complex borders, drainage changes and restricted access all add time.
A typical sequence
The work may include excavation, waste removal, installation and compaction of the sub-base, edging, drainage, the base course and finally the resin-bound finish. Some layers require suitable curing or settling time before the next stage begins.
Weather matters
Resin should be laid in suitable dry conditions. A responsible installer may adjust the schedule rather than risk the quality of the finished surface during rain or excessive moisture.
After the survey, Glidestone Resin will provide a realistic programme for the individual property.